Xintang Hospital, Guangzhou Zengcheng District Project
[Xintang Hospital] is located in the old city area of Xintang Town, mostly surrounded by old residential areas and villages with narrow roads. And Xintang hospital daily people flow and traffic flow is very large, often have the trouble of road congestion. Before the construction of Eounice three-dimensional parking garage, the parking space in the station area was tight, it was difficult to come to see a doctor and park, and arbitrary charges caused many problems for the city management.
Oles with its strong technology research and development ability and highly coordinated manufacturing strength, for the project design into 5 lift transverse class stereo parking, separate three parking area, provide 150 parking Spaces, help solve the xintang hospital surrounding parking tension, parking difficulties, effectively improve the road traffic congestion. Enough parking space and increased parking space, greatly improve the parking experience of car owners, add more convenience.
Project highlights
The project adopts the design of 5 storey lifting and horizontal parking garage, covering an area of 1135 ㎡, and the total height of the garage is 10 meters. The project is equipped with a perfect intelligent parking induction system, which is increased to 150 parking Spaces on the basis of only 50 cars parked, with an increase rate of 200%. The size of the parking space is 5300mm * 2200mm * 1850mm, which covers more and more comprehensive models. It can effectively solve the lack of parking space and external road congestion, delay of medical treatment, "parking for half an hour, see a doctor for 10 minutes" and other phenomena. Enough and intimate parking design also greatly improves the parking experience of car owners.
During the peak period of the traffic flow in the project, there will be 4 staff members on duty, which is convenient for citizens to store and pick up the car. Thanks to the excellent moving line design in the project, separate the design of three stereo garages, use the area as much as possible, accelerate the traffic flow and the allocation of parking Spaces, and reduce the waiting time. At the same time, there are 15 ground parking Spaces, parked as oversized vehicles, suitable for all variety of vehicles. The appearance of the project is also decorated with guardrail, which can block the wind and rain, dust, and protect the vehicles.
Project operation
The project was completed at the end of October 2021, and it has been in operation for nearly three years, with an average of 500 vehicles coming in and out per day. After the stereo garage is built and used, it has helped to solve the parking needs around Xintang Hospital, and reduce the road congestion, delay in medical treatment, traffic accidents, inconvenience of medical parking, and the crowding of fire and ambulance access. It provides more smooth and convenient parking facilities, saves land resources, and greatly improves the parking, travel and medical experience of car owners.